| |||||||
This section shall be known as and may be cited as the "Stormwater Management Ordinance of the Borough of Red Bank" | |||||||
Flood control, groundwater recharge, and pollutant reduction through nonstructural or low impact techniques shall be explored before relying on structural Best Management Practices (BMPs). Structural BMPs should be integrated with nonstructural stormwater management measures and proper maintenance plans. Nonstructural measures include both environmentally sensitive site design and source controls that prevent pollutants from being placed on the site or from being exposed to stormwater. Source control plans should be developed based upon physical site conditions and the origin, nature, and the anticipated loading of potential pollutants. Multiple stormwater management BMPs may be necessary to achieve the established performance standards for water quality, quantity, and groundwater recharge | |||||||
**Webmasters Note: The subsection above has been amended as per Ordinance No. 2007-19. | |||||||
b. Purpose. It is the purpose of this section to establish minimum stormwater management requirements and controls for "major development as defined in Section 25-8.29-1.2, Definitions.
| |||||||
c. Applicability.
| |||||||
1. This section shall be applicable to all site plans and subdivisions for the following major developments that require preliminary or final site plan or subdivision review:
| |||||||
(a) Non-residential major developments; and
| |||||||
(b) Aspects of residential major developments that are not pre empted by the Residential Site Improvement Standards at N.J.A.C. 5:21; and
| |||||||
2. This ordinance shall also be applicable to all major developments undertaken by the Borough of Red Bank.
| |||||||