§ 16-933 STANDARDS AND REGULATIONS AFFECTING THE RGA-3 ZONE.

A. Minimum Standards.

1. Gross Lot Area: 1 acre.

2. Building Setbacks:

3. Lot Frontage: 75 feet.

4. Gross Floor Area: N/A.

5. First Floor Area: N/A.

B. Maximum Regulations.

1. Dwelling Unit Density: 20 du/acre.

2. Lot Coverage: 70%.

3. Floor Area Ratio: N/A.

4. Building Height: 2 1/2 stories; 35 feet.

C. Other Regulations.

1. Temporary construction trailers shall be permitted where active construction work is proposed. Such trailers shall not be placed on site until building permits have been issued and in no case more than seven (7) days prior to the commencement of work. Trailers shall not remain on site more than seven (7) days after completion of all work. Temporary construction trailers shall not be placed within the right-of-way of any improved public road.

§ 16-934 STANDARDS AND REGULATIONS AFFECTING THE RHA ZONE.

A. Minimum Regulations.

1. Tract Area: 5 acres.

2. Net Tract Area: 3.5 acres.

3. Building Setbacks - Principal Buildings:

a. One hundred forty (140') feet from an arterial or collector road, or twice the building height from any arterial or collector right-of-way line, whichever is greater.

b. Fifty (50') feet from any other street right-of-way.

4. Parking: 1.5 spaces per dwelling unit or as approved by the Planning Board in developments where the keeping of automobiles by residents is restricted.

5. Open Space: 25 percent of the gross tract area.

6. Recreation Areas: 8 percent of the gross tract area. All recreation areas shall maintain the required building setbacks from street rights-of-way.

B. Maximum Regulations.

1. Density: 20 dwelling units per gross tract acre.

2. Building Height: 60 feet.

C. Other Regulations.

1. The site design, building design, and layout of individual dwelling units shall meet or exceed New Jersey Uniform Construction Code minimum property standards for family and/or elderly housing, including provisions for community activity spaces and the handicapped.

2. Unless otherwise specified herein or otherwise determined by the Planning Board, the maximum and minimum regulations of the RGA Zone district shall apply for parking, building, yard and setback standards.

3. Buffer Areas. Buffer areas shall be provided in accordance with Section 16-606.

4. Temporary construction trailers shall be permitted where active construction work is proposed. Such trailers shall not be placed on site until building permits have been issued and in no case more than seven (7) days prior to the commencement of work. Trailers shall not remain on site more than seven (7) days after completion of all work. Temporary construction trailers shall not be placed within the right-of-way of any improved public road.

§ 16-935 STANDARDS AND REGULATIONS AFFECTING THE RHA-1 ZONE.

A. Minimum Standards.

1. Gross Lot Area: 5 acres.

2. Building Setbacks:

3. Lot Frontage: 100 feet.

4. Gross Floor Area: N/A.

5. First Floor Area: N/A.

B. Maximum Regulations.

1. Dwelling Unit Density: 35 du/acre.

2. Lot Coverage: 60%.

3. Floor Area Ratio: N/A.

4. Building Height: 60 feet.

C. Other Regulations.

1. The site design, building design, and layout of individual dwelling units shall meet or exceed New Jersey Uniform Construction Code minimum property standards for family and/or elderly housing, including provisions for community activity spaces and the handicapped.

2. Unless otherwise specified herein or otherwise determined by the approving authority, the maximum and minimum regulations of the RGA Zone district shall apply for parking, building, yard and setback standards.

3. Buffer Areas. Buffer areas shall be provided in accordance with Section 16-606.A.

4. Unless provided to the contrary herein, applications for development approval in the RGA Zone shall follow and be subject to the applicable ordinances, procedures, regulations, standards and guidelines as required for preliminary and final site plan review and other applicable ordinances which are incorporated herein by reference.

5. Temporary construction trailers shall be permitted where active construction work is proposed. Such trailers shall not be placed on site until building permits have been issued and in no case more than seven (7) days prior to the commencement of work. Trailers shall not remain on site more than seven (7) days after completion of all work. Temporary construction trailers shall not be placed within the right-of-way of any improved public road.

§ 16-936 STANDARDS AND REGULATIONS AFFECTING THE OR ZONE.

A. Minimum Standards.

1. Lot Area:

a. Gross Lot Area: 167,000 square feet.

b. Buildable Lot Area: 2.5 acres.

2. Building Setbacks:

3. Lot Frontage: 500 feet.

4. Gross Floor Area: 20,000 square feet.

5. First Floor Area: 20,000 square feet.



B. Maximum Regulations.

1. Dwelling Unit Density: N/A.

2. Lot Coverage: 35%.

3. Floor Area Ratio: 22%.

4. Building Height: 3 stories; 50 feet.

C. Other Regulations.

1. Temporary construction trailers shall be permitted where active construction work is proposed. Such trailers shall not be placed on site until building permits have been issued and in no case more than seven (7) days prior to the commencement of work. Trailers shall not remain on site more than seven (7) days after completion of all work. Temporary construction trailers shall not be placed within the right-of-way of any improved public road.

§ 16-937 STANDARDS AND REGULATIONS AFFECTING THE OR-1 ZONE.

A. Minimum Standards.

1. Gross Lot Area:

a. Gross Lot Area: 250,000 square feet.

b. Buildable Lot Area: 3.5 acres.

2. Building Setbacks:

3. Lot Frontage: 750 feet.

4. Gross Floor Area: 20,000 square feet.

5. First Floor Area: 20,000 square feet.

B. Maximum Regulations.

1. Dwelling Unit Density: N/A.

2. Lot Coverage: 25%.

3. Floor Area Ratio: 16%.

4. Building Height: 3 stories; 50 feet.

C. Other Regulations.

1. Temporary construction trailers shall be permitted where active construction work is proposed. Such trailers shall not be placed on site until building permits have been issued and in no case more than seven (7) days prior to the commencement of work. Trailers shall not remain on site more than seven (7) days after completion of all work.

§ 16-938 STANDARDS AND REGULATIONS AFFECTING THE OR-2 ZONE.

[Ord. No. 96-2441]

A. Minimum Regulations.

1. Lot Area: 3 acres.

2. Lot Frontage: 200 feet.

3. Building Setbacks:

a. Front Setback: 75 feet.

b. Rear Setback:

(1) Principal Building: 75 feet.

(2) Accessory Building: 75 feet.

c. Side Setbacks:

(1) Principal Building: one side 20 feet, combined sides 50 feet.

(2) Accessory Building: 20 feet.

4. Parking. Off-street parking shall be provided in accordance with Section 16-627.R.

5. Minimum Gross Floor Area.

a. First floor of multi-story buildings: 10,000 square feet.

B. Maximum Regulations.

1. Lot Coverage: 50 percent.

2. Floor Area Ratio (FAR): 0.25.

3. Building Height: 3 stories; 40 feet.

C. Other Regulations.

1. Temporary construction trailers shall be permitted where active construction work is proposed. Such trailers shall not be placed on site until building permits have been issued and in no case more than seven (7) days prior to the commencement of work. Trailers shall not remain on site more than seven (7) days after completion of all work. Temporary construction trailers shall not be placed within the right-of-way of any improved public road.