§ 213-484. Traffic.



As part of the special exception permitting process, hot-mix asphalt plants shall demonstrate truck routes from the site to major connector roads and/or highways that avoid residential streets.



§ 213-485. Parking.

As part of the special exception permitting process, hot-mix asphalt plants shall demonstrate sufficient on-site parking for all trucks that may be required when the facility is operating at maximum capacity.



§ 213-486. Landscaping.



Hot-mix asphalt facilities shall be either enclosed with opaque perimeter fencing between six and eight feet high, or with a landscaped buffer occupying a minimum of 20% of the setback area.



§ 213-487. Site planning.



As part of the special exception permitting process, hot-mix asphalt plants shall demonstrate the use of site planning to mitigate plant impacts, with such features as:



A. The use of berms to mitigate noise and dust, and maintain runoff on site;



B. The siting of the facility's offices as a screen to machinery and equipment.

**Webmasters Note: The previous Article has been added as per Local Law No. 16-2005.