Table 1 Water Quality Design Storm Distribution

(2) For purposes of TSS reduction calculations, Table 2 below presents the presumed removal rates for certain BMPs designed in accordance with the New Jersey Stormwater Best Management Practices Manual. The BMP Manual may be obtained from the address identified in § 87A-7, or found on the Department's Web site at www.njstormwateroug. The BMP Manual and other sources of technical guidance are listed in § 87A-7. TSS reduction shall be calculated based on the removal rates for the BMPs in Table 2 below. Alternative removal rates and methods of calculating removal rates may be used if the design engineer provides documentation demonstrating the capability of these alternative rates and methods to the review agency. A copy of any approved alternative rate or method of calculating the removal rate shall be provided to the Department at the following address: Division of Watershed Management, New Jersey Department of Environmental Protection, PO Box 418, Trenton, New Jersey, 08625-0418.

(3) If more than one BMP in series is necessary to achieve the required eighty-percent TSS reduction for a site, the applicant shall utilize the following formula to calculate TSS reduction:

R = AB-(AXB)/100 Where

R -- total TSS percent load removal from application of both BMPs

A = the TSS percent removal rate applicable to the first BMP

B -- the TSS percent removal rate applicable to the second BMP