A development permit shall be obtained before construction or development begins within any area of special flood hazard established in Section 2.2. Permit is required for any development that could possibly increase or alter the flood hazard. Application for a development permit shall be made on forms furnished by the Construction Official and may include, but not be limited to, plans drawn to scale not less than those required for subdivision or site plan review purposes, showing the nature, location, dimensions and elevations of the area in question; existing or proposed structures, fill, storage of materials; drainage facilities; and the location of the foregoing. Specifically, the following information is required (Site Plan Review Ordinance of the Town of Newton, Chapter XIX, as may be amended from time to time): | |||||||
(1) elevation in relation to mean sea level, of the lowest floor (including basement) of all structures;
| |||||||
(2) elevation in relation to mean sea level to which any structure has been floodproofed will be floodproofed;
| |||||||
(3) certification by a registered professional engineer or architect that the floodproofing methods for any nonresidential structure meet the floodproofing criteria in section 4.22, and
| |||||||
(4) description to the extent to which any watercourse will be altered or relocated as a result of proposed development.
| |||||||
| |||||||
The Construction official is hereby appointed to administer and implement this Ordinance by granting or denying development Permit applications in accordance with its provisions. | |||||||
| |||||||
Duties of the Construction official shall include, but not be limited to: | |||||||