(b) For purpose of TSS reduction calculations, Table 2 below presents the presumed removal rates for certain BMPs designed in accordance with the New Jersey Stormwater Best Management Practices Manual. The BMP Manual may be obtained from the address identified in Subsection G, or found on the Department's website at www.njstormwater.org. The BMP Manual and other sources of technical guidance are listed in Subsection G. TSS reduction shall be calculated based on the removal rates for the BMPs in Table 2 below. Alternative removal rates and methods of calculating removal rates may be used if the design engineer provides documentation demonstrating the capability of these alternative rates and methods to the review agency. A copy of any approved alternative rate or method of calculating the removal rate shall be provided to the Department at the following address: Division of Watershed Management, New Jersey Department of Environmental Protection, PO Box 418, Trenton, New Jersey 08625-0418.
| |||||||
(c) If more than one BMP in series is necessary to achieve the required eighty-percent TSS reduction for a site, the applicant shall utilize the following formula to calculate TSS reduction:
| |||||||
R.= A + B - (AXB)/100
| |||||||
Where: | |||||||
R.= total TSS percent load removal from application of both BMPs, and
| |||||||
A.= the TSS percent removal rate applicable to the first BMP
| |||||||
B.= the TSS percent removal rate applicable to the second BMP
| |||||||
| |||||||
(d) If there is more than one on-site drainage area, the eighty-percent TSS removal rate shall apply to each drainage area, unless the runoff from the subareas converge on site, in which case the removal rate can be demonstrated through a calculation using a weighted average.
| |||||||
(e) Stormwater management measures shall also be designed to reduce, to the maximum extent feasible, the post-construction nutrient load of the anticipated load from the developed site in stormwater runoff generated from the water quality design storm. In achieving reduction of nutrients to the maximum extent feasible, the design of the site shall include nonstructural strategies and structural measures that optimize nutrient removal while still achieving the performance standards in Subsection D(6) and (7).
| |||||||
(f) Additional information and examples are contained in the New Jersey Stormwater Best Management Practices Manual.
| |||||||
(g) In accordance with the definition of "FW1" at N.J.A.C. 7:9B-1.4, stormwater management measures shall be designed to prevent any increase in stormwater runoff to waters classified as FW1.
| |||||||
(h) Special water resource protection areas shall be established along all waters designated Category One at N.J.A.C. 7:9B, and perennial or intermittent streams that drain into or upstream of the Category One waters as shown on the USGS Quadrangle Maps or in the County Soil Surveys, within the associated HUC14 drainage area. These areas shall be established for the protection of water quality, aesthetic value, exceptional ecological significance, exceptional recreational significance, exceptional water supply significance and exceptional fisheries significance of those established Category One waters. These areas shall be designated and protected as follows:
| |||||||
[1] The applicant shall preserve and maintain a special water resource protection area in accordance with one of the following:
| |||||||
[a] A three-hundred-foot special water resource protection area shall be provided on each side of the waterway, measured perpendicular to the waterway from the top of the bank outwards or from the center line of the waterway where the bank is not defined, consisting of existing vegetation or vegetation allowed to follow natural succession.
| |||||||
[b] Encroachment within the designated special water resource protection area under Subsection D(7)(h)[1][a] above shall only be allowed where previous development or disturbance has occurred (for example, active agricultural use, parking area or maintained lawn area). The encroachment shall only be allowed where applicant demonstrates that the functional value and overall condition of the special water resource protection area will be maintained to the maximum extent practicable. In no case shall the remaining special water resource protection area be reduced to less than 150 feet as measured perpendicular to the top of bank of the waterway or center line of the waterway where the bank is undefined. All encroachments proposed under this subsection shall be subject to review and approval by the Department.
| |||||||
[2] All stormwater shall be discharged outside of and flow through the special water resource protection area and shall comply with the Standard for Off-Site Stability in the Standards For Soil Erosion and Sediment Control in New Jersey, established under the Soil Erosion and Sediment Control Act, N.J.S.A. 4:24-39 et seq.
| |||||||
[3] If stormwater discharged outside of and flowing through the special water resource protection area cannot comply with the Standard For Off-Site Stability in the Standards for Soil Erosion and Sediment Control in New Jersey, established under the Soil Erosion and Sediment Control Act, N.J.S.A. 4:24-39 et seq., then the stabilization measures in accordance with the requirements of the above standards may be placed within the special water resource protection area, provided that:
| |||||||
[a] Stabilization measures shall not be placed within 150 feet of the Category One waterway;
| |||||||
[b] Stormwater associated with discharges allowed by this section shall achieve a ninety-five-percent TSS post-construction removal rate;
| |||||||
[c] Temperature shall be addressed to ensure no impact on the receiving waterway;
| |||||||
[d] The encroachment shall only be allowed where the applicant demonstrates that the functional value and overall condition of the special water resource protection area will be maintained to the maximum extent practicable;
| |||||||
[e] A conceptual project design meeting shall be held with the appropriate Department staff and Soil Conservation District staff to identify necessary stabilization measures; and
| |||||||
[f] All encroachments proposed under this section shall be subject to review and approval by the Department.
| |||||||
[4] A stream corridor protection plan may be developed by a regional stormwater management planning committee as an element of a regional stormwater management plan or by a municipality through an adopted municipal stormwater management plan. If a stream corridor protection plan for a waterway subject to Subsection D(7)(h) has been approved by the Department of Environmental Protection, then the provisions of the plan shall be the applicable special water resource protection area requirements for that waterway. A stream corridor protection plan for a waterway subject to Subsection D(7)(h) shall maintain or enhance the current functional value and overall condition of the special water resource protection area as defined in Subsection D(7)(h)[1][a] above. In no case shall a stream corridor protection plan allow the reduction of the special water resource protection area to less than 150 feet as measured perpendicular to the waterway subject to this subsection.
| |||||||
[5] Subsection D(7)(h) does not apply to the construction of one individual single-family dwelling that is not part of a larger development on a lot receiving preliminary or final subdivision approval on or before February 2, 2004, provided that the construction begins on or before February 2, 2009.
| |||||||
E. Calculation of stormwater runoff and groundwater recharge.
| |||||||
(1) Stormwater runoff shall be calculated in accordance with the following:
| |||||||
(a) The design engineer shall calculate runoff using one of the following methods:
| |||||||
[1] The USDA Natural Resources Conservation Service (NRCS) methodology, including the NRCS Runoff Equation and Dimensionless Unit Hydrograph, as described in the NRCS National Engineering Handbook Section 4 - Hydrology and Technical Release 55 - Urban Hydrology for Small Watersheds; or
| |||||||
[2] The Rational Method for peak flow and the Modified Rational Method for hydrograph computations.
| |||||||
(b) For the purpose of calculating runoff coefficients and groundwater recharge, there is a presumption that the preconstruction condition of a site or portion thereof is a wooded land use with good hydrologic condition. The term "runoff coefficient" applies to both the NRCS methodology at Subsection E(1)(a)[1] and the Rational and Modified Rational Methods at Subsection E(1)(a)[2]. A runoff coefficient or a groundwater recharge land cover for an existing condition may be used on all or a portion of the site if the design engineer verifies that the hydrologic condition has existed on the site or portion of the site for at least five years without interruption prior to the time of application. If more than one land cover have existed on the site during the five years immediately prior to the time of application, the land cover with the lowest runoff potential shall be used for the computations. In addition, there is the presumption that the site is in good hydrologic condition (if the land use type is pasture, lawn, or park), with good cover (if the land use type is woods) or with good hydrologic condition and conservation treatment (if the land use type is cultivation).
| |||||||
(c) In computing preconstruction stormwater runoff, the design engineer shall account for all significant land features and structures, such as ponds, wetlands, depressions, hedgerows or culverts, that may reduce preconstruction stormwater runoff rates and volumes.
| |||||||