§ 348-8.1. General improvement standards.
| |||||||
A. General. All improvements shall be installed in complete accordance with the standards of this chapter, with other particular specifications approved by the Planning Board and Township Engineer and with all other applicable municipal, county, state and federal regulations. Should improvements be required which are not provided for within the particular sections of this chapter, they shall be designed and constructed in accordance with good engineering practice and recognized design standards. The developer, or his engineer, shall submit detailed design calculations and construction specifications in each such instance. Prior to the initiation of such specialized design, the particular standards to be utilized shall be submitted for review by the Planning Board and Township Engineer.
| |||||||
B. Standard specifications and construction details. The Standard Specifications for Road and Bridge Construction of the New Jersey Department of Transportation (latest edition), including all addenda, and the Standard Construction Details of the New Jersey Department of Transportation (latest revision), as modified, supplemented, amended or superseded by the requirements of this chapter, by the approved final plat, by particular agreement among the Planning Board, Township Committee and subdivider or by other applicable municipal, county, state or federal regulations, shall govern the completion of the required improvements. Such Standard Specifications and Standard Construction Details are made a part of this chapter by reference and will not be herein repeated. It is the responsibility of all developers to familiarize themselves with these standards, copies of which may be examined at the offices of the Township Clerk and Township Engineer and may be obtained, upon payment of the cost thereof, from the New Jersey Department of Transportation. The requirements of this chapter, of an approved final plat or of particular agreements and conditions of approval and of applicable municipal, county, state or federal regulations shall govern and prevail in the case of conflict between them and the Standard Specifications or Standard Construction Details. Should the Township adopt, subsequent to the effective date of this chapter, particular and specific Standard Construction Details for Dover Township, they shall govern and prevail over the Standard Construction Details of the New Jersey Department of Transportation previously referred to.
| |||||||
§ 348-8.2. General design standards.
| |||||||
A. Objectives. All site plan and subdivision plats shall conform to design standards that will encourage desirable development patterns within the Township. Where either or both an Official Map or Master Plan have been adopted, the site plan or subdivision shall conform to the proposals and conditions shown thereon. The streets, drainage rights-of-way, school sites, public parks and playgrounds and other municipal facilities shown on an adopted Master Plan or Official Map shall be considered in the review of site plans and subdivision plats. Where no Master Plan or Official Map exists, or makes no provisions therefor, streets and drainage rights-of-way shall be shown on the final plat in accordance with N.J.S.A. 40:55D-38 and shall be such as to lend themselves to the harmonious development of the municipality and the enhancement of the public welfare.
| |||||||
B. Responsibility for design. Within the criteria established by and subject to the review and approval of the Planning Board, all design of a site plan or subdivision is the responsibility of the developer, and he shall be responsible for and bear the entire cost of any and all investigations, tests, reports, surveys, samples, calculations, environmental assessments, designs, researches or any other activity necessary to the completion of the design. The standards set forth in this chapter shall be taken to be the minimum necessary to meet its purposes, as set forth elsewhere herein. The responsibility of the Planning Board shall be to see that these minimum standards are followed and, in those cases not covered by these standards, sufficient precautions are taken to assure that the eventual design is conducive to the implementation of the purposes of this chapter and the Township Master Plan. The Planning Board may employ professionals in various disciplines to advise and assist it in its determinations. Any decisions of the Planning Board regarding the suitability or sufficiency of any design proposal, taken upon advice of its professionals and subject to the provisions of this chapter, shall be deemed conclusive.
| |||||||
C. Design data. To properly execute the design of a site plan or subdivision, it is anticipated that the developer will obtain or cause to be obtained certain design data, including but not limited to soil tests and analyses, environmental assessments, traffic studies and traffic projections, surveys, reports and similar design data. Any and all such data obtained by the developer, or by others retained by him to complete the design, shall be made available to the Planning Board and its employees and professional consultants for the purpose of reviewing the proposed design. Should the Planning Board determine that the design data submitted is not sufficient for the purpose of completing a full review of the proposal, it may request the applicant to provide such additional information as is deemed necessary. Until the applicant supplies such information, no submission under the provisions of this chapter shall be termed complete. Nothing contained herein shall be interpreted to prevent the Planning Board from making or causing to be made such independent studies, calculations or other undertakings as it deems necessary in the review of any application for development.
| |||||||
D. Design standards. When a developer determines that it will be necessary to utilize design standards in addition to or other than those minimum requirements established herein, he is advised to consult with the Planning Board Engineer, prior to beginning his detailed design, for review and approval of his proposed design standards. Standards utilized should generally be nationally recognized and in common use in this area. Design standards may not be utilized if they do not have the approval of the Planning Board Engineer.
| |||||||
E. Waiver of requirements. It is recognized that, in certain instances, preexisting conditions or the uniqueness of a particular proposal may require the waiver of some of the standards presented herein. The Planning Board may consider and, for cause shown, may waive strict conformance with such of these detailed design standards as it sees ft. Any developer desiring such action shall present with his application for development a listing of all such waivers desired, together with the reasons therefor.
| |||||||